HASTINGS — Lake Hastings Park was abuzz Friday with adults in bright red T-shirts focused on a playground.
They spread mulch, filled holes with concrete, bolted bright plastic tubes together and fixed a twisted slide to steel beams.
Over 175 volunteers were on hand to help with the build, serve on the safety committee, provide lunch and play with children.
The build started at 8:30 a.m. Friday and wrapped up around 2:30 p.m. with a dedication ceremony and ribbon cutting. The playground is at 900 S. Shore Drive, near the boat ramp.